Milestone

Home > About HongShang > Milestone
2016
  • In September 2, Visual Identity System was published in order to unify the using of company name and company visual identity. The visual identity of Hongshang won Art registration certificate in China Copyright Protection Center.
  • In march, the more powerful 5.0Mev electronic accelerator have been put into operation
2015
  • November 2015, the headquarters moved to Baolong High-tech Park. And Hongshang New Energy Technology Company was founded.

  • August 2015, Hongshang was list on National Equities Exchange and Quotations, and stock symbol is 833316
2014
  • November 2014, Hongshang won the Shenzhen High-tech Enterprise certificate again.
  • September 2014, Hongshang won the National High-tech Enterprise certificate again.

2013
  • December 2013, class 1E category K1 heat shrink tubing for nuclear power station was approved.
  • November 2013, Hongshang cold shrink accessories and premoulded accessories passed ISO 9001: 2008 Quality Management Systerm Certification.
  • March 2013, 24kV heat shrink cable accessories was KEMA certified according to HD629.
2012
  • July 2012, class 1E category K2/K3 heat shrink tubing designed for nuclear power station passed the product identification of China National Nuclear Corporation.

2011
  • October 2011, Hongshang dual wall tubing H-5(3X)(4X), H-5(3X)(4X)F were certified by CCS.
  • May 2011, Hongshang 35kV cold shink cable accessories passed the complete type test of Wuhan High Voltage Research Institute.
2010
  • September 2010, Hongshang 8.7/15(17.5)kV heat shrink cable accessories have passed the complete type test according to IEC 60502-4(2005) at KEMA Laboratories.

2008
  • December 2008, Hongshang won the national high-tech enterprise certificate.

  • November 2008, Hongshang moved its manufacturing to the green-field investment factory in Huizhou. Total number of employee: 500. Total land area: 65000m2.
  • June 2008, Hongshang was IECQ QC080000 certified.

  • May 2008, 20kV heat shrink cable accessories and 24 kV cold shrink cable accessories were IEC certified.

2007
  • December 2007, Hongshang became a joint stock enterprise.
  • October 2007, Hongshang Header electronic Co.,Ltd was founded.
  • August 2007, Huizhou Hongshang Electric Co.,Ltd was founded.
  • March 2007, " Radiation modification polymer materials R&D center" was established, which has a total area of 2000m2.
2006
  • November 2006, Due to increasing turnover, Hongshang invested in a new factory inHongshang invested in Nankeng, Shenzhen which had a total area of 26400m .
2005
  • Hongshang received “High-Tec Enterprise” award from the Shenzhen local government.

2002
  • December 2002, Hongshang was ISO 9001: 2000 certified.
  • Hongshang has passed the international certification of American Bureau of Shipping.
2001
  • the manufacturing location moved to Nankeng Cun, in Buji town of Shenzhen. Total manufacturing area in 2001 was 13000m2.

  • In 2001, Hongshang introduced the first electron accelerator.
2000
  •        October 2000, Hongshang was ISO 9002:1994 certified.

  • Hongshang core products such as : H2(Z), H5(3X)(4X) were UL and CSA certified.
  • Zhong Xiaoguang, the chief engineer, joined Hongshang.
1994
  • June 1994, Hongshang was founded in Tianmian Cun, Futian district, Shenzhen.